PMDC offers joint ventures in the following Projects
Gold & Base Metal Geochemical Exploration
Encouraged with the results generated under this Project M/s Minorco carried out further work by analyzing 32 elements on 2600 duplicate samples and has confirmed 586 anomalies including 97 of gold. During the year 1999-2000 the Project concentrated in locating gold mother rocks. Their hectic work has identified at least five localities with the following gold values
Final report of the Project is going to be submitted within the year 2001. Ultra Refined Crystalline Salt (PVD Salt)Ultra Refined crystalline salt is not produced in the country. There is a good market in the elite society both in Pakistan as well as in the nearby Middle East countries. Our Warcha Salt Mines are producing about 200,000 tons of rock salt annually. Resources are sufficient to double this production. Plant with 150,000 tons of PVD (Pure Vacuum Dried) salt is considered to be a good rationale target to meet the demand both inside and export purpose. Its possible investment is about US$40 million. Smokeless Coal Briquetting PlantTotal coal resources of the country stand about 186 billion tons largely located in Sindh. JICA carried out feasibility studies and suggested to install a 50,000 tons capacity plant at the initial stage later on up-graded into a 300,000 tons capacity plant. For the production of one ton of coal briquettes the following raw material will be used
PMDC has 38 million tons coal in its own lease with the production capacity of 300,000 tons annually. Planned production can be increased if coal briquetting plant is designed on these resources. PMDC has its own experience in operating a briquetting plant at Quetta. With a vision of large population and need for high industrialization power requirement is inevitable. Oil and gas based power plants' production cost is rapidly increasing. Coal with known resources stands a good viable proposition in thermal power generation. PMDC is supplying coal to the WAPDA thermal power plant at Khanot. We offer our coal with the following average analysis as received basis
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
©
PMDC 2000. ® All Rights Reserved.
|